C

PT. CEMERLANG MAKMUR ABADIJAYA

Jl. Raya Cakung No. 1, Jakarta Timur · Telp 021-8877-3300

Laporan Trip

Rekapitulasi perjalanan muat dan bongkar container

Periode: 01 Sep 2026 – 30 Sep 2026Dicetak: 28 Sep 2026
Periode:01 Sep 2026 – 30 Sep 2026

Total Trip

16

Total Container

17

Termasuk container kedua

Total Revenue

Rp 64.550.000

Total Cost

Rp 41.070.000

No. Trip Tanggal Job Order Container 1 Size Kendaraan Driver Rute Divisi Status Revenue Cost
TRP/2026/09/100128 Sep 2026 08:15JO/MTI/2026/09/0552SPNU292139140 ftB 9761 UEJAndriPabrik MTI Kendal → Pelabuhan Tanjung EmasUmum LoadingRp 4.250.000Rp 2.710.000
TRP/2026/09/100228 Sep 2026 08:30JO/MTI/2026/09/0555SPNU308470440 ftB 9919 FEIAkwanPabrik MTI Kendal → Pelabuhan Tanjung EmasUmum DepartedRp 4.250.000Rp 2.690.000
TRP/2026/09/100327 Sep 2026 07:45JO/MTI/2026/09/0564MSKU774211040 ftB 9027 BEARifalPelabuhan Tanjung Emas → Pabrik MTI KendalUmum CompletedRp 3.900.000Rp 2.475.000
TRP/2026/09/100426 Sep 2026 09:10JO/CMAJ/2026/09/0124HLXU665099340 ftB 9886 FEIDedeDepo Cakung → Pelabuhan Tanjung PriokUmum CompletedRp 2.600.000Rp 1.700.000
TRP/2026/09/100529 Sep 2026 06:00JO/MTI/2026/09/0571FCIU778120920 ftB 9992 PEHFauziPabrik MTI Kendal → Pelabuhan Tanjung EmasUmum AssignedRp 4.600.000Rp 2.890.000
TRP/2026/09/100624 Sep 2026 05:30JO/KLS/2026/09/0031CMAU558296940 ftB 9345 VBNYusufPelabuhan Perak → Pabrik KalimasSamudera CompletedRp 5.600.000Rp 3.670.000
TRP/2026/09/100723 Sep 2026 10:20JO/KLS/2026/09/0035OOLU812334540 ftB 9723 WXY-Pabrik Kalimas → Pelabuhan PerakSamudera UnloadingRp 4.900.000Rp 3.060.000
TRP/2026/09/100822 Sep 2026 11:00JO/CMAJ/2026/09/0130TCLU443128720 ftB 9102 TGHDoniDepo Perak → Gudang SurabayaSamudera CompletedRp 2.400.000Rp 1.475.000
TRP/2026/09/100920 Sep 2026 07:00JO/MTI/2026/09/0541SPNU2921391 / FCIU778120940 ftB 9761 UEJAndriPabrik MTI Kendal → Pelabuhan Tanjung EmasUmum CompletedRp 4.600.000Rp 2.805.000
TRP/2026/09/101028 Sep 2026 13:40JO/MTI/2026/09/0552BMOU502244720 ftB 9993 PEHIrwanPabrik MTI Kendal → Pelabuhan Tanjung EmasSamudera DepartedRp 4.250.000Rp 2.710.000
TRP/2026/09/101128 Sep 2026 14:10JO/MTI/2026/09/0555SPNU292139140 ftB 9770 FEIRidwanPabrik MTI Kendal → Pelabuhan Tanjung EmasSamudera WaitingRp 4.250.000Rp 2.690.000
TRP/2026/09/101227 Sep 2026 15:30JO/MTI/2026/09/0564FCIU778120920 ftB 9919 FEIAkwanPelabuhan Tanjung Emas → Pabrik MTI KendalUmum CompletedRp 3.900.000Rp 2.475.000

Menampilkan 1–12 dari 16 data

Jumlah Trip: 16Total Revenue: Rp 64.550.000Total Cost: Rp 41.070.000Profit: Rp 23.480.000